The statement about the critical path method (CPM) that is true is: " It is an example of a variable time project scheduling method.." (Option A)
What is the critical path method and why is it important?The critical path is defined by project managers as the process when it comes of dependent tasks in a project. Project managers may more readily prioritize work, create realistic timelines, maintain projects on budget, and avoid or offset delays by identifying the essential route.
The key variables for scheduling are
Task Timelines. This is the expected time required to execute a job using available resources.
There are also Parallel Tasks. These are the tasks that can be accomplished at the same time. Then there are preceding Tasks. These are the activities that must be accomplished before proceeding to other, dependent tasks.
Learn mroe about the critical path method:
https://brainly.com/question/24227953
#SPJ1
All digital systems that perform arithmetic operations must indicate _______ and ________ for numbers.
A. size, base
B. sign, magnitude
C. sign, base
D. magnitude, base
For numbers, any digital systems that perform arithmetic operations must display the "sign" and "magnitude."
A "digital system" is a collection of components that uses hardware, software, and networks. For instance, a computer has a central processing unit, a hard drive, a keyboard, a mouse, and a monitor, among other things. One system may be made up of a multitude of different pieces. There are just a few discrete values available for signals in digital systems. Analog systems take values from a continuous set, whereas Mixed Signal Systems use both Digital and Analog components. The digital and analog systems are commonly used to represent signals. The numerous digital systems that are all around us include computers, smartphones, scanners, cash registers, and digital ticket readers.
Learn more about digital systems from
brainly.com/question/4507942
#SPJ4
What component in the solar cell provides electrons to replace the electrons released by the dye?.
The component in the solar cell that provides electrons to replace the electrons released by the dye is "a layer of graphite"
What is the explanation for the above process?A layer of graphite will operate as a counter electrode at the glass/electrolyte border, delivering electrons to the solution to replace these electrons that go on to the FTO glass.
They are reintroduced into the cell on a metal electrode on the rear, commonly known as the counter electrode, after passing through the external circuit and flowing into the electrolyte. The electrons are subsequently returned to the dye molecules by the electrolyte, which regenerates the oxidized dye.
PV cells make use of a variety of semiconductor materials. When exposed to light, the semiconductor absorbs the energy and converts it to negatively charged particles in the material known as electrons. This increased energy permits electrons to flow as an electrical current through the material.
Learn more about Solar Cells:
https://brainly.com/question/12053447
#SPJ1
Suppose we have the instruction LDA 800. Given memory as follows: Memory 800 900 900 1000 1000 500 1100 600 1200 800 What would be loaded into the AC if the addressing mode for the operating is immediate? A) 800 B) 900 C) 1000 D) 500 E) None of the above
If the addressing mode for the instruction is immediate, then the value that is loaded into the accumulator (AC) will be the value of the instruction itself, which in this case is 800. So the answer would be A) 800.
Explanation in Detail:
In immediate addressing mode, the value to be used by the instruction is encoded directly in the instruction itself, rather than being stored in a specific memory location. This is in contrast to other addressing modes, such as direct or indirect, in which the value to be used by the instruction is stored in a specific memory location, and the instruction specifies the address of that memory location.
For example, suppose the instruction was LDA 900, with an addressing mode of direct. In this case, the value that would be loaded into the AC would be the value stored at memory location 900, which in this case is 900.
To learn more about memory location, visit: https://brainly.com/question/14698134
#SPJ4
Design the following circuit in Verilog, be careful with syntax and all language rules, commas, semicolons etc. (Any mistake, even if small, will result in deductions) Use async/active-low reset for all flip-flops. (Note: thick wires represent 4 bit connections...) XIN[3:0] MUX data_in[3:0] XOUT[3:0] D Q CLK ARSIN CLK ARSTN SEL
Below is the design of the circuit in Verilog, with syntax and all rule of language like commas, semicolons etc.
VERILOG CODE IN STRUCTURAL MODEL:
1) VERILOG CODE OF D FLIP FLOP
module DFF (CLK, D, ARSTN, Q);
input CLK, D, ARSTN;
output Q;
reg data = 1'b0;
if (ARSTN)
data <= 1'b0;
else
data <= D;
assign Q = data;
endmodule
2) VERILOG CODE OF MUX
module MUX (d0, d1, SEL, Y);
input d0, d1, SEL;
output Y;
assign Y = SEL ? d0 : d1;
endmodule
3) VERILOG CODE OF TOP FILE
module circuit (XIN, data_in, CLK, ARSTN, SEL, XOUT);
input XIN, data_in, CLK, ARSTN, SEL;
output XOUT;
wire s0, s1;
DFF UUT0 (CLK, data_in, ARSTN, s0);
MUX UUT1 (XIN, s0, SEL, s1);
DFF UUT2 (CLK, s1, ARSTN, XOUT);
endmodule
OUTPUT:
To know more about VERILOG, visit: https://brainly.com/question/24228768
#SPJ4
what are the layers of water referred to in an ekman spiral? group of answer choices wind fluid turbulent laminar
Water is used as an ekman spiral fluid layer.
What do water spirals go by?The Coriolis effect results in the Ekman spiral, which was proposed in 1902 by Swedish physicist Vagn Walfrid Ekman (1874–1954). Because of the wind's force, surface water molecules move, dragging deeper layers of water molecules with them.
The Ekman layer is how thick?Ekman layer, a vertical area of the ocean subject to surface water movement caused by wind. This layer, which bears the name V. Walfrid Ekman after a Swedish oceanographer, is around 100 meters deep (about 300 feet).
To know more about Ekman spiral fluid visit :-
https://brainly.com/question/14440533
#SPJ1
3. The scale of the blueprint tells us the ________ of drawing to real space?
Boundary
Proportion
Weight
or
None of the above
The scale of the blueprint tells us the boundary of the drawing to real space. The correct option is a.
What is the scale of the blueprint?It is a photographic print in white on a bright blue background or blue on a white background, particularly useful for copying maps, mechanical drawings, and architect's designs
The plan of the construction is a project prediction that is slightly auto cad. The scale factor provides information on the dimensions and measurements of things represented by smaller copies in maps, blueprints, scale drawings, and scale models. The scale tells us how much actual length some length on the scale graphic represents.
Therefore, the correct option is a, Boundary.
To learn more about the scale of the blueprint, refer to the link:
https://brainly.com/question/8887076
#SPJ1
The purpose of the idler gear is to either __________ of the driven gear or transfer power to a location which is farther from the driver shaft.
The purpose of the idler gear is to either change the direction of rotation of the driven gear or transfer power to a location which is farther from the driver shaft.
What is an idler gear?A motion is produced when two gears are placed next to one another and move in opposing directions. A third gear, called an idler gear, is used between the two gears when they both need to move in the same direction. The only thing it changes is the direction in which the second gear spins, and it only transfers motion from one gear to the other.
The "driven gear" accepts motion, and the "driving gear," which transmits motion, are the gears that the idler connects. As if the idler gear weren't there, the gear ratio between the driving and driven gears is calculated in the same way.
Learn more about driven gear
https://brainly.com/question/12513059
#SPJ1
Oil tanks used on engines equipped with Hydromatic propellers will feed the pressure pump from a standpipe, leaving reserve oil for ______ ______.
Feathering and a propeller.
What the pressurised oil is sent somewhere by the oil pump?It travels from the pump to the exterior of the oil filter, where it is pushed through the filter media to the centre, where it then leaves the oil filter and enters the engine's oil galleries. Additionally, the oil filter contains a bypass valve to prevent the pressure from falling too low if it clogs.
Which pump refills the oil tank with oil?Pumping Oil The oil pump is made to circulate oil through coolers as needed and return it to the oil tank after propeller oil under pressure to the engine's lubrication-dependent elements.
To know more about propeller visit:-
https://brainly.com/question/27922904
#SPJ4
3.what information is typically provided on the grade stamp of visually graded lumber? explain, with the help of an example of a typical grade stamp.
The mill identification number must be included on a lumber grade stamp.
What is stamp-grade lumber?A grade stamp on the lumber will be looked for when a building is inspected. The inspector can only identify the quality of the wood used in the structure based on this grade stamp. Given that all construction standards call for it, the grade stamp is very significant to building inspectors.
How is timber grade determined?The quantity of transparent surface area on a board's side with the worst appearance determines its grade (with hardwoods one side will look better than the other). Long and wide, with a significant portion of its area defective, a higher grade board. -free
To know more about grade stamp visit:-
https://brainly.com/question/5881426
#SPJ4
if roberts electronics finds that the average total cost of its radar detectors and the marginal cost of its radar detectors are both $85, then:
-its marginal costs are falling
-average total cost is at its maximum
-average total costs are rising
-demand is elastic
-average total cost is at its lowest level
If roberts electronics finds that the average total cost of its radar detectors and the marginal cost of its radar detectors are both $85, then the average total cost is at its lowest level.
What is a Radar Detectors?
If you own a car, enjoy driving, or simply want to save money, a radar detector is a must-have device. A radar detector and a dash camera can work together. While they each serve different functions, they both work together to protect you and your vehicle.
A radar detector's purpose is to save you from speeding tickets by detecting police radar waves that officers use with radar guns to measure the speed of your vehicle.
When a radar detector detects these radar waves, it will alert you both audibly and visually, allowing you to slow down within the speed limit in good time. The idea is that a single speeding ticket should be enough to cover the cost of the radar detector.
To know more about Radar Detectors, visit: https://brainly.com/question/15896467
#SPJ4
what is the limited approach boundary distance for an exposed fixed circuit part on a 480y/277-volt distribution panel?
The limited approach boundary distance for an exposed fixed circuit part on a 480y/277-volt distribution panel is 3'6".
What is an exposed fixed circuit?An exposed Fixed Circuit part is, a bare conductor or another circuit component that is stationary and will not move. This is the most often used Limited Approach Boundary value. Exposed Movable Conductor - A bare conductor that can move (e.g., an overhead transmission line conductor).
The limited approach boundary distance for an exposed fixed circuit part on a 480y/277-volt distribution panel is 3 feet 6 inches, which indicates that persons and objects should not go any closer to live electrical parts than this distance in order to avoid electrical shock or another injury.
Learn more about fixed circuits;
https://brainly.com/question/15256538
#SPJ1
order the following key steps that bi follow to transform raw data into easy to digest insights for everyone in an organization to use.
Steps in order to transform raw data into easy to digest insights for everyone in an organization to use:
1. Collect and transform data from multiple sources
2. uncover trends and inconsistencies using tools such as Data Mining
3. present findings using tools such as visualization
4. take action on insights in real time
What is raw data?The information that is gathered from a source, but in its unprocessed form, is known as raw data. It hasn't been cleaned, arranged, or visually presented yet, let alone processed.
Raw data can be manually typed, written down, recorded, or entered automatically by a machine. Databases, files, spreadsheets, and even source devices like cameras are just a few of the places where you can find raw data. One type of potential energy-containing data is raw data.
Here are some illustrations of raw data:
A list of every purchase made at a store during a month, but without any additional organization.Each and every frame of overnight security camera footagegrades for a quarter of all students in a school districtLearn more about raw data
https://brainly.com/question/26830274
#SPJ1
Which of the following applies to brake fluid?
A) Brake fluid is a petroleum based fluid.
B) Brake fluid standards are set by each manufacturer.
C) Brake fluids cannot be mixed.
D) All of the above.
From the list given, the option that applies to brake fluid is: "Brake fluids cannot be mixed." (Option C)
What is Brake Fluid?Brake fluid is a specialized liquid that is made from silicone or glycol. The petroleum fractionating technique does not produce brake fluid. In current autos, three types of braking fluid are routinely used: DOT 3, DOT 4, and DOT 5.
It is to be noted that when the brakes are applied, brake fluid is a type of hydraulic fluid that is used in hydraulic braking systems to convert force into pressure and bring the vehicle to a full stop.
Learn more about Brake Fluid:
https://brainly.com/question/12459874
#SPJ1
A hallow steal tube with an inside diameter 50 mm must carry atensile load of 500 KN.
Determine the outside diameter of the tube if the stress is limited to 120 MN/m2
53mm is the outside diameter of the tube which is having inner diameter 50mm and carrying a tensile load of 500KN and stress limited to 120MN/m2.
Stress: Internal Resistance offered by a body to the deformation when the force applied on it.
For Hallow steel tube which is having Inner diameter Di =50mm and outer diameter Do=
Tensile load F=500KN and Tensile stress σ=120MN/m2
Stress= Force/unit area σ=[tex]\frac{F}{A}[/tex]
Area of the Hollow steel tube is A= π/4(Do²-Di²)
F=σA ⇒ 500000= 120×π/4 (Do²- (50)²)
500000= 30π(Do²-2500)
500000=30πDo²-75000π
500000-75000π=30πDo²
(500000-75000π)/30π=Do²
Do=52.96(53)mm
Hence outer diameter is 53mm
To Study more about Stress:https://brainly.com/question/25748369
through friendship we can overload the << operator for the iostream library allowing the programmer to define how an object interacts with cout. True/False
False, Through the buddy function, unary and binary operators can both be overloaded. The friend function also allows for operator overload.
Which operator from the list below cannot be overloaded?The sizeof operator, typeid, Scope resolution (::), Class member access operator (.), Ternary, or conditional operator (?:) are some operators that cannot be overloaded. These operators cannot be overloaded because it would be syntactically impossible and could lead to serious programming errors.
Which of the following features is utilized in default argument and function overloading?Both of the aforementioned types provide function overloading, which is the fundamental idea of polymorphism.
To know more about operators visit:-
https://brainly.com/question/20916293
#SPJ4
A list of 16 issues that led to incorrect formulations in Tuncey Bayrak's jam manufacturing unit in New England is provided below:1. Incorrect measurement2. Antiquated scales3. Lack of clear instruction4. Damaged raw material5. Operator misreads display6. Inadequate cleanup7. Incorrect maintenance8. Inadequate flow controls9. Variability in scale accuracy10. Equipment in disrepair11. Technician calculation off12. Jars mislabeled13. Temperature controls off14. Incorrect weights15. Priority miscommunication16. Inadequate instructions** Create a fish-bone diagram and categorize each of these issues correctly, using the 4 m's method. **
A fishbone diagram, as the name implies, is a representation of a fish skeleton.
Underlying problems of the Fish head:
The underlying problem is represented by the fish's head (facing right), and the causes are represented by the bones of the skeleton; the ribs branch off the back and represent major causes, while sub-branches represent root causes.
The 4M method identifies and groups causes that have an impact on a specific effect. The 4M categories (Material, Method, Machine, and Man) are frequently used in Kaoru Ishikawa's Cause-Effect
What is a Fishbone Diagram ?
A fishbone diagram is a cause-and-effect discovery tool that assists in determining the cause(s) of defects, variations, or failures in a process.
In other words, it aids in the breakdown of root causes that may contribute to an effect in successive layers.
A fishbone diagram, also known as an Ishikawa diagram or cause-and-effect analysis, is one of the primary tools used in root cause analysis.
To know more about Diagram, visit: https://brainly.com/question/24457739
#SPJ4
Explain how the following scenario illustrates a failure to understand the importance of attending an accredited academic program.
Situation: Sean is a recent graduate with a bachelor’s degree in athletic training from a non-accredited college. He wants to obtain a position at a rehabilitation clinic but is having trouble finding a job. Sean: “I do not understand why I cannot seem to get hired. I have all the coursework. We were not required to take clinical labs.”
Accreditation is a process that determines whether educational programmes meet predefined quality standards.
Accreditation is not permanent; it must be renewed on a regular basis to ensure that the educational program's quality is maintained.
What is accredited program ?Accreditation is the recognition by an accrediting agency that an institution meets certain educational standards. The United States Department of Education keeps a database of accrediting agencies that it recognizes.Academic accreditation in the United States is voluntary, decentralised, and carried out by numerous non-governmental, non-profit organisations. Academic accreditation typically concludes with an external quality review conducted by a team of professional experts from academia or industry.Attending an unaccredited programme may prevent you from receiving federal financial aid, from transferring credits to another school, and from obtaining appropriate professional licensure in your field.While some unaccredited programmes may provide beneficial learning experiences, not all educational opportunities are created equal. Attending an unaccredited programme may prevent you from receiving federal financial aid, from transferring credits to another school, and from obtaining appropriate professional licensure in your field.To learn more about Accreditation refer :
https://brainly.com/question/22560558
#SPJ1
you perform 100 j of work on a refrigerator that extracts heat from a cold reservoir and dumps heat into a hot reservoir. the amount of heat dumped into the hot reservoir must be
With 100 J of heat available from the first law of thermodynamics, we would dump it into the hot reservoir.
What exactly is the first thermodynamics law?We are aware that the study of heat transfer falls under the purview of thermodynamics. Heat is a factor that could raise an object's temperature. As a result, heat can also be referred to as a type of energy that results from the temperature differential between the things.
The heat engine reservoir is what?A heat engine is a device that uses a heated body as a reservoir and transfers heat there from to perform work. A small amount of heat is discharged toward the sink (cold body).
To know more about reservoir visit:-
https://brainly.com/question/26888545
#SPJ4
Declare an array of double of size 365 to store daily temperatures for one year. Using this data structure, write a code fragment to find -The hottest and coldest days of the year. - The average temperature of each month. - The difference between the hottest and coldest days of every month. - The temperature of any given day. The day is specified by two input values: month(1,…,12) and day (1,…,31) . Reject invalid input values (e.g., 13 for month and 32 for day). Part 2 Repeat part 1 , using a two-dimensional array of double with 12 rows and each row having 28,30 , or 31 columns.
You can use an array to do the task :
double[] temperatures = new double[365];
What is an array?An array is a data structure that is used to store a collection of items. It is typically used to store items of the same type, such as a list of integers or a list of strings.
Each item in an array is called an element, and each element has a specific index, or position, in the array. Arrays are commonly used in programming because they allow for efficient access and manipulation of large amounts of data.
To Know More About Datatypes, Check Out
https://brainly.com/question/28706924
#SPJ1
report the moment arm for the resultant hydrostatic force. report your answer in meters and to 4 significant digits.
The moment arm for the resultant hydrostatic force in metres upto 4 significant digits is 0.9491 M.
What is Hydrostatic force?
In the Cummins equation, the hydrostatic forces are the forces on a body caused by changes in hydrostatic pressure on the wetted surface of the body as it moves away from its equilibrium position.
As a result, the hydrostatic forces are proportional to the body displacements xj. Hydrostatic forces are simple linear functions of displacements for small amplitudes of motion, which can be defined by a stiffness coefficient matrix.
This is the standard method for modeling WECs; however, for large amplitudes of motion, and especially when the body surface at the water-plane is not vertical, a nonlinear representation of the hydrostatic forces is preferable.
To know more about Hydrostatic force, visit: https://brainly.com/question/14815733
#SPJ4
determine the shearing stress for an incompressible newtonian fluid with a velocity distribution of where v in m/s
Stresses in a Newtonian fluid due to shear. A fluid cannot resist shearing forces while it is at rest. These forces cause it to continuously distort.
What does fluid under shear stress mean?Many non-Newtonian fluids are shear-thinning or pseudoplastic, that is the viscosity h) decreases with increasing shear-rate γ. The product, however, constantly grows with increasing shear-rate since the size of the shear stress always does as well.
What does Newtonian fluid shear rate mean?A fluid that has constant viscosity and a shear rate that is directly proportional to the shear stress is referred to as a Newtonian fluid.
To know more about fluid visit:-
https://brainly.com/question/21708739
#SPJ4
2 I. Choose the correct answer 1. Which one of the following is true about psychology A. The scientific study of human behavior B. The scientific study of mental process C. Focuses on individuals behavior. D. The study of personality F. All E. A and B 2. The term psychology comes from A. Germany B, Greek 3. Psychology is C. American D. European F. All A. Relies on investigating questions B. Use arrange of techniques to study the human mind and behavior C. Emerged from biology and philosophy D. All E. A and B 4. Which one of the following is not true about dependent variable A. It is determined by independent variables B. Not depended on independent variables C. It has both positive and Negative relationship with independent variables. D. All 5. Which one of the following is not true about correlation research A. It determines how much of difference exists between variables B. It can establish cause and effect C. A and B 6. Which one of the following is true about psycho analytic psychology? A. Our conscious mind is only tip of iceberg. B. The author was Sigmund Freud C. The focus is on unconscious mind
Answer:
psychology is the scientific study of human behavior and mental processes
Psychology is the scientific study of human behavior and mental processes.
What is Psychology?
The study of human thought, behavior, development, personality, emotion, motivation, and more is covered by the large and complex area of psychology.
Different subfields and specialization areas have consequently emerged.
This specialized field, which is connected to clinical psychology and psychotherapy, focuses on the study and treatment of a wide range of mental diseases. Biopsychology (sometimes known as biological psychology) is the study of how biological processes affect the mind and behavior.
Therefore, Psychology is the scientific study of human behavior and mental processes.
To learn more about Psychology, refer to the link:
https://brainly.com/question/13044291
#SPJ2
2. A refrigerator has COP of 3. How much work must be supplied to the refrige rator in order to remove 200 J of heat from its interior n? ***************
66.7 J of work is supplied by the refrigerator in order to remove 200J of heat from its interior. Which is having COP of 3
COP of refrigerator is defined as the ratio of heat removed from the substance (refrigerator) to Work input.
Full form of COP is Coefficient of Performance.
Formula of COP = Heat Removed(Q)/ Work input( W)
we have COP =3
Q= 200J substitute in formula
3=200/w ⇒ w=200/3 ⇒ 67J
Hence 66.7 J of work is supplied by the refrigerator in order to remove 200J of heat from its interior. Which is having COP of 3
To study more about Heat :https://brainly.com/question/19666326
If you are creating an artificial cell and you want this cell to be capable of the greatest sensitivity to an applied signal, which would be the most useful?.
The most popular technique for creating artificial cells is cell encapsulation.
What is artificial cell?Artificial cell is defined as a manufactured particle that replicates one or more biological cells' functions. A type of artificial structures with physiologically active components is referred to as "artificial cells."
In order to create encapsulated cells, liquid cell suspensions are often divided into controlled-size droplets, which are quickly hardened or gelled to offer additional stability. They can be utilized as biomimetic systems to analyze the dynamics of cells with little interference from cellular complexity, to study and comprehend the characteristics of biological cells,
Thus, the most popular technique for creating artificial cells is cell encapsulation.
To learn more about artificial cell, refer to the link below:
https://brainly.com/question/28948682
#SPJ1
a developer ordered several truckloads of soil to be used in a new housing project for backfill to replace ground removed by excavation for construction. used to brace a structure (especially a foundation or footings). . his most probable intended use would be
a developer ordered several truckloads of soil to be used in a new housing project for backfill to replace ground removed by excavation for construction. used to brace a structure (especially a foundation or footings). His most probable intended use would be to fill in excavations or around foundation walls.
Who is a developer?
In the construction industry, a project developer is a professional who oversees the operations of a project by conducting research and developing plans that best meet the needs of the project. A developer is typically thought of as someone who develops land through construction and who, as a result, becomes an owner of the developed land.
To create project activities, schedules, and regular project progress reports, the developer will typically collaborate with the project manager.
To learn more about a developer, use the link given
https://brainly.com/question/28000992
#SPJ4
I need help solving questions.
Answer:
what's the question that you want us to answer.
Computer science question
Using the knowledge of computational language in python it is possible to write a code that function called foo(), which is passed a value, and returns a value.
Writting the code:function foo
parameter p1 //which is equal to "JOHN PAUL SMITH" in this case
if (p1 has more than 1 occurrence of " " [i.e. more than 1 spaces])
ReturnValue = everything after the 2nd " " in p1
else if (p1 only has 1 occurrence of " " [i.e. 1 space])
ReturnValue = everything after the 1st " " within p1
else //[i.e. no spaces]
ReturnValue = p1
endif
endif
return ReturnValue
See more about python at brainly.com/question/18502436
#SPJ1
An offset can be used for which of the following purposes?
I. To avoid the use of fittings
II. To change the direction of the conduit
III. To change the elevation of the conduit
IV. To enter a knockout in a box or enclosure
V. To go around an obstruction
Select one:
a. I., II., and III.
b. II., III., and IV.
c. III., IV., and V.
d. IV. and V. only
In order to avoid fits, To reverse the conduit's direction, to modify the conduit's elevation.
What is the offset angle that is most frequently used?The most typical bend is a 30° bent, followed by another 30° bend, for a total bend of 60°, however this is not always necessary. All hand benders include bend markings of 10, 22, and, on occasion, 45 or 60 degrees. These bends should be employed when necessary.
What is the name for a 90-degree bend?a curve at a right angle. a 90° curve. the increase in a conduit section. Stub-up. the conduit's real length after it has been bent.
To know more about conduit's visit:-
https://brainly.com/question/19342587
#SPJ4
consider the finite state machine below to answer the following questions. what is the least number of flip flops required to design this fsm?O 5:4 choice O 5:9 choice O 5:16O 5:18O 5:none of the above
If we reduce states, we can design FSM with only 2 Flip Flops instead of the required 4 Flip Flops for designing the above FSM. Since nothing is mentioned here by default, we decrease the number of states.
Therefore, the correct response is: 2 flip flops or None of the above.
What is FSM?A finite-state machine (FSM), also known as a finite automaton (FSA, plural: automata), a finite automaton, or simply a state machine, is a type of mathematical model for computation. It is an abstract machine that only ever has a single possible state at a time out of a finite set.
The FSM can transition from one state to another in response to some inputs; the transition between two states is known as a change. Lists of states, an initial state, and the inputs that cause each transition are used to define FSMs. Deterministic and non-deterministic finite state machines are the two types of finite state machines. Equivalent to any non-deterministic finite-state machine, a deterministic one can be built.
Learn more about finite-state machine
https://brainly.com/question/13576930
#SPJ4
the wire and bar drawing process involves pulling metal through an opening in a die in which the metal takes on the shape of the die opening.
When a wire (or bar) is drawn through a die opening, the cross section of the metal is reduced. This process is known as wire drawing (or bar drawing).
By hand, how is wire drawn?Hand pulling is used to draw silver wire. drawing thicker silver wire with a crank. Wire drawing is a metalworking technique used to shrink a wire's cross section by dragging it through just one hole.
How do you sketch metal?By dragging the metal through a die to shape and size it into the desired wire, rod, tube, or other part, metal drawing is a cold working operation.
To know more about wire drawing visit :-
https://brainly.com/question/27735578
#SPJ4