Please help me on this question

Please Help Me On This Question

Answers

Answer 1

Answer:

it would be A

Step-by-step explanation:

you have to find angle C first so you would subtract 105 from 180 to get 75 and then to find angle B you would add 75 and 55 to get 130 and since its a triangle it always has 180 degrees so do 180 - 130 to get 50


Related Questions

Work out
1/8
of 760

please help​

Answers

Answer: 95

Step-by-step explanation:

Think of 1/8 times 760 as 760/8 because it’s the same thing.

The volume of a rectangular prism is 1,560 cm3. The height is 12 cm. The width is w and the length is w + 3. Find w.

Answers

Volume = w * h * l
w = w, h = 12, l = w + 3
1,560 = w * 12 * w + 3
1,560 = 12w^2 + 3
-12w^2 = 3 - 1,560
-12w^2 = -1557
w^2 = 519/4
w = 11.39079 cm
You can round it if you want

Answer:

w=10 cm

Step-by-step explanation:

The formula for the volume of a rectangular prism is V=whl.

So in this case, the equation would be 1560=w·12·(w+3). Then, we can simplify this equation.

1. Divide 12 to both sides of the equation. 1560/12=130. The equation becomes 130=w(w+3).

2. Distribute w through the parentheses, the equation becomes 130=w²+3w.

3. Then, -130 from both sides of the equation, so we can get the quadratic: w²+3w-130=0.

4. Factor the quadratic. w²+3w-130=(w-10)(w+13).

5. (w-10)(w+13)=0. w=10 or w=-13. However, w is the width of a rectangular prism, can the width of a shape be negative? No. So we can ignore the solution w=-13. Therefore, w=10cm.

6. To make sure our answer is correct, let's substitute the values back into the volume of a rectangular prism formula: V=whl. w=10; h=12; l=10+3=13; V=10(12)(13)=120*13=1560 cm³. As a result, our answer is correct, w=10 cm.

Hope this helps, have a nice day.

Analyze and sketch a graph of the function. Find any intercepts, relative extrema, points of inflection, and asymptotes. (If an answer does not exist, enter DNE.)
f(x) = 3x2/3 − 2x
I keep getting stuck at taking the first derivative and solving for critical points. So please show all work and even some of the tedious algebra bits included so I can see where I'm messing up?

Answers

The function f(x) = 3x²/3 - 2x has no intercepts, a relative minimum at (1, -1), no points of inflection, and no asymptotes.

Intercepts: To find the x-intercepts, we set f(x) equal to zero and solve for x:

0 = 3x²/3 - 2x

0 = x² - 2x

0 = x(x - 2)

x = 0 or x = 2

Therefore, both x = 0 and x = 2 are not actual x-intercepts, but rather double roots.

Relative Extrema: To find the relative extrema, we take the derivative of f(x) and set it equal to zero,

f'(x) = 2x - 2

0 = 2x - 2

2 = 2x

x = 1

Substituting x = 1 back into the original function, we find f(1) = -1. Therefore, the relative minimum occurs at (1, -1).

f''(x) = 2

Since the second derivative is a constant, it never equals zero. Therefore, there are no points of inflection for this function.

Asymptotes: To determine if there are any asymptotes, we examine the behavior of the function as x approaches positive or negative infinity. Since the highest power of x in the function is 2, the graph does not approach any vertical asymptotes.

For horizontal asymptotes, we look at the limits as x approaches positive or negative infinity:

lim(x→∞) f(x) = lim(x→∞) (3x²/3 - 2x) = ∞

The limits approach positive infinity in both cases, indicating that there are no horizontal asymptotes. Graphically, the function represents a parabola that opens upwards, with a relative minimum at (1, -1).

To know more about asymptote of functions, visit,

https://brainly.com/question/4138300

#SPJ4

Claim: the average age of online students is 32 years old. Can you prove it is not? What is the null hypothesis? o What is the alternative hypothesis? What distribution should be used? o What is the test statistic? o What is the p-value? o What is the conclusion? o How do we interpret the results, in context of our study? • Claim: the proportion of males in online classes is 35%. Can you prove it is not? o What is the null hypothesis? o What is the alternative hypothesis? o What distribution should be used? o What is the test statistic? o What is the p-value? o What is the conclusion? o How do we interpret the results, in context of our study?

Answers

To predict a linear regression score, you first need to train a linear regression model using a set of training data.

Once the model is trained, you can use it to make predictions on new data points. The predicted score will be based on the linear relationship between the input variables and the target variable,

A higher regression score indicates a better fit, while a lower score indicates a poorer fit.

To predict a linear regression score, follow these steps:

1. Gather your data: Collect the data p

points (x, y) for the variable you want to predict (y) based on the input variable (x).

2. Calculate the means: Find the mean of the x values (x) and the mean of the y values (y).

3. Calculate the slope (b1): Use the formula b1 = Σ[(xi - x)(yi - y)]  Σ(xi - x)^2, where xi and yi are the individual data points, and x and y are the means of x and y, respectively.

4. Calculate the intercept (b0): Use the formula b0 = y - b1 * x, where y is the mean of the y values and x is the mean of the x values.

5. Form the linear equation: The linear equation will be in the form y = b0 + b1 * x, where y is the predicted value, x is the input variable, and b0 and b1 are the intercept and slope, respectively.

6. Predict the linear regression score: Use the linear equation to predict the value of y for any given value of x by plugging in the x value into the equation. The resulting y value is your predicted linear regression score.

To know more about linear regression scores:- brainly.com/question/30670065

#SPJ11

Find the least common multiple of 18, 24, 42

Answers

Answer: 504. Multiple for : 18, 24 and 42. Factorize of the above numbers : 18 = 2 • 32 24 = 23 • 3. 42 = 2 • 3 • 7

bro I NEED HELP FAST

Answers

It’s D 2 1/3 because 1/3 each 3 days is 3/3 and then plus another one is 6/3 and plus one more is 9/3

Use the image provided to answer please​

Answers

B? I’m not quite sure but I think it’s that.

Please help, Im stuck on this part of a review and Im really confused asap

Answers

Answer:

( 6, -1 )

Step-by-step explanation:

When you rotate 1 from the x axis by 90° it becomes -1 from the y axis.

When you rotate 6 by 9° from thr y axis, it becomes again 6 on the x axis

Your new x value is 6 and y is -1

So (6,-1)

Answer:

(-6, 1)

Step-by-step explanation:

To find the point obtained by rotating point P = (1, 6) counterclockwise by an angle of 90 degrees (r₉₀°), we can use the rotation formula:

x' = x * cos(θ) - y * sin(θ)

y' = x * sin(θ) + y * cos(θ)

In this case, θ is 90 degrees.

Substituting the values into the formula:

x' = 1 * cos(90°) - 6 * sin(90°)

y' = 1 * sin(90°) + 6 * cos(90°)

cos(90°) = 0 and sin(90°) = 1, so we have:

x' = 1 * 0 - 6 * 1 = -6

y' = 1 * 1 + 6 * 0 = 1

Therefore, r₉₀°(P) = (-6, 1). The point P = (1, 6) rotates counterclockwise by 90 degrees to the point (-6, 1).

#SPJ1

Help Please! Find The Circumference Of A Circle With R=12.3.

Answers

Answer:

77.28

Step-by-step explanation:

c=π2r

12.3 times 2 =

24.6π

=77.28317928

=77.28

Answer:

77.3

Step-by-step explanation:

What is the slide e of the line shown below?

Answers

Answer:

13/6

Step-by-step explanation:

slope = (y2-y1)/(x2-x1) where the variables indicate the coordinates of the two points

slope = (-7-6)/(-5-1) = -13/-6 = 13/6

I’ll mark you brainlieist

Answers

1. Divide by 4
x < 5

2. Subtract 4
x < 21

3. Add 8
x > 40

4. divide by -4( flip inequality sign b/c dividing by negative) so > turns into >
x < -6

The rest using the same concept. Try them yourself and ask for help if you need it

The range of a projectile that is launched with an initial velocity v at an angle of a with the horizontal is given by R

sin

where g is the acceleration due to gravity or 9.8 meters per second squared. If a projectile is launched with an initial velocity of 1

meters per second, what angle is required to achieve a range of 20 meters? Round answers to the nearest whole number.

Answers

Answer:

[tex]\theta=30.285^{\circ}[/tex]

Step-by-step explanation:

The range of a projectile is given by :

[tex]R=\dfrac{u^2\sin2\theta}{g}[/tex]

Put R = 20 m, u = 15 m/s and finding the value of angle of projection

So,

[tex]R=\dfrac{u^2\sin2\theta}{g}\\\\\sin2\theta=\dfrac{Rg}{u^2}\\\\\sin2\theta=\dfrac{20\times 9.8}{15^2}\\\\\sin2\theta=0.871\\\\2\theta=\sin^{-1}(0.871)\\\\2\theta=60.57\\\\\theta=30.285^{\circ}[/tex]

So, the required angle of projection is equal to [tex]30.285^{\circ}[/tex].

These box plots show daily low temperatures for a sample of days in two different towns

Answers

A is the correct answer. The other choices don’t match the box plots.

Answer:

A. The median for town A, 30 degrees, is less than the median for town B, 40 degrees.

Step-by-step explanation:

A local U-Move moving truck rental company provides the following probability distribution regarding the number of rental trucks that will be rented in a given week. Find the number of rental trucks the company can expect to rent during a given week.
Number of Rented Trucks Probability
0 0.23
1 0.18
4 0.27
5 0.32
a) 2.6800
b) 2.8600
c) 0.6700
d) 2.3100
e) 0.7150
f) None of the above.

Answers

Option (b) 2.8600 is the correct answer.

To find the number of rental trucks that a local U-Move moving truck rental company can expect to rent during a given week, we need to find the expected value of the probability distribution.

The expected value of a probability distribution is given by:

Expected Value = Sum of (Number of Rented Trucks × Probability)

Therefore, Expected Value = (0 × 0.23) + (1 × 0.18) + (4 × 0.27) + (5 × 0.32)

Expected Value = 0 + 0.18 + 1.08 + 1.6Expected Value = 2.86

Therefore, the company can expect to rent 2.86 rental trucks during a given week. Option (b) 2.8600 is the correct answer.

To know more about expected value visit:

https://brainly.in/question/5669176

#SPJ11

HELPPP PLSSS IF YOUR A BOT I WILL REPORT !! A(b) is a function

Answers

False not a function

Iodine-131 has a half-life of days. How much would be left of an original g sample after days?

Answers

Answer:

I will suppose that the actual question is:

Iodine-131 has a half-life of 8 days. How much would be left of an original g sample after x days?

Ok, a half-life means that after that time, the mass of the original sample is reduced to half.

So if we start it a quantity g of iodine-131, after 8 days, we will have g/2.

Also, remember that the decay is written as an exponential decay, then we will have:

A(x) = g*(r)^x

where:

A is the amount of the sample after x days, g is the initial amount of the material (such that A(0) = g) and r is the rate of decay.

We know that:

A(8) = g/2 = g*(r)^8

Now we can solve this for r:

g/2 = g*(r)^8

1/2 = r^8

(1/2)^(1/8) = r = 0.917

Then the amount of material after x days is given by:

A(x) = g*(0.917)^x

Which point is a solution to the inequality in this graph

Answers

Given:

The graph of an inequality.

To find:

The point which is a solution of the given graph of inequality.

Solution:

From the given graph it is clear that the boundary line of the graph is a dotted line. It means the points lie in shaded region are in the solution set but the points on the line are not included in the solution set.

The points (3,2) and (-3,-6) are lie on the boundary line. it means they are not the solution of the inequality represented by the given graph.

Point (5,0) lies on the positive x-axis at the distance of 5 units from the origin and it doesn't lies in the shaded region. So, (5,0) is not a solution.

Point (0,5) lies on the negative y-axis at the distance of 5 units from the origin and it lies in the shaded region. So, (0,5) is a solution.

Therefore, the correct option is B.

Alinear trendline used to forecast sales for a given time period takes the form y = b+ bil. increases by , then the estimated y value all else e tone period, increases, b1; constant o tone period, increases, bo, constant bione period, increases; bo constant bi: one period, increases bi: constant

Answers

The linear trendline used to forecast sales for a given time period takes the form y = b0 + b1t, where y represents the estimated sales, b0 is the constant term, b1 is the coefficient of the time period variable (t), and t is the time period.

In this equation, the coefficient b1 determines the relationship between the time period and the estimated sales. If b1 increases, it means that for each additional time period, the estimated sales will also increase. On the other hand, if b1 is constant, it implies that the estimated sales do not change with each additional time period.

To know more about linear trendlines here: brainly.com/question/31313926

#SPJ11

not sure how to do this. need help

Answers

Answer:

a) 25/2 or 12.5

b) 78,125

c) 625

d) 30,517,578,125

The population of a city is 218720.
The population has been increasing at the rate of 2% per year.
What was the population 3 years ago?​

Answers

Correct Answer is 205,857

Consider the first order differential equation t et y'+ = , y' + t2 – 25 y t-99 For each of the initial conditions below, determine the largest interval a

Answers

For the given first-order differential equation, we need to determine the largest interval on which a unique solution exists for each initial condition. The interval will depend on the specific initial condition and the behavior of the differential equation.

The first-order differential equation is given as:

t^et y' + y' + t^2 – 25yt - 99

To determine the largest interval on which a unique solution exists for each initial condition, we need to consider the behavior of the equation and any possible singularities or discontinuities.

For each initial condition, we can use standard techniques such as separation of variables or integrating factors to solve the differential equation and find the solution. The solution will depend on the initial condition and may have different behaviors based on the values of t and y.

It's important to note that the existence and uniqueness of solutions are generally guaranteed within a certain interval as long as the equation and initial condition satisfy certain conditions, such as Lipschitz continuity. However, without specific initial conditions, it is not possible to determine the exact intervals on which a unique solution exists.

Therefore, to determine the largest interval on which a unique solution exists for each initial condition, further analysis and specific initial conditions are required to assess the behavior of the equation and identify any constraints or limitations on the solution.

Learn more about first-order differential equation here:

https://brainly.com/question/30645878

#SPJ11

Assume that all components of three panels, randomly selected and with 5, 5 and 5 components respectively, were examined. Assume that a component chosen at random is defective with probability 0.09 , independently of the other components.
What is the probability of detecting at most one defective component, when all components of these three panels are examined?

Answers

The probability of detecting at most one defective component when all components of the three panels are examined is approximately 0.78136 or 78.14%.

To calculate the probability of detecting at most one defective component when all components of the three panels are examined, we need to consider the possible combinations of defective components in each panel.

Let's break down the problem step by step:

Panel 1:

- There are 5 components in Panel 1.

- The probability of a component being defective is 0.09.

- We want to calculate the probability of detecting at most one defective component.

The probability of detecting no defective components in Panel 1 is:

P(0 defective) = (1 - 0.09)^5 = 0.52201

The probability of detecting exactly one defective component in Panel 1 is:

P(1 defective) = 5 * 0.09 * (1 - 0.09)^4 = 0.40408

The probability of detecting at most one defective component in Panel 1 is:

P(at most 1 defective) = P(0 defective) + P(1 defective) = 0.52201 + 0.40408 = 0.92609

Panel 2 and Panel 3 have the same probabilities as Panel 1 since they also have 5 components and the same probability of a component being defective.

Now, to calculate the probability of detecting at most one defective component when examining all three panels, we multiply the probabilities of each panel:

P(at most 1 defective in all three panels) = P(at most 1 defective in Panel 1) * P(at most 1 defective in Panel 2) * P(at most 1 defective in Panel 3)

                                          = 0.92609 * 0.92609 * 0.92609

                                          = 0.78136

For more such questions on probability,click on

https://brainly.com/question/251701

#SPJ8    

Based on the Pythagorean theorem, select all of the following statements that must be true

Answers

Answer:

The 1st and 4th statements are true.

Subject:Mathematics ​

Answers

Answer:F : 13 1/2

Step-by-step explanation:27 divided by 2 is 13 1/2

how many square miles does ATC and radar services attempt to cover? How many aircraft at any given time is ATC monitoring, and spread over how many airports within the USA?

Answers

The work of providing air traffic control and radar services in the United States falls under the purview of the Federal Aviation Administration (FAA). ATC and radar services that  cover all airspace over the United States, regardless of whether flights are domestic or international.

What is the radar services

FAA provides ATC and radar services in the US. ATC and radar services cover all US airspace, including domestic and international flights. The FAA manages the NAS, covering 29.5 million sq mi. This includes airspace over the entire United States, including Alaska, Hawaii, Guam, Puerto Rico. VI ATC monitors varying number of aircraft based on time, weather, and traffic.

The FAA deals with 44k flights daily in the US. Note that this number may increase during peak travel periods. The FAA manages ATC for 13k+ US airports. Incl. international, regional, gen. aviation & priv. airstrips. The number can vary due to new or old airports.

Learn more about radar services  from

https://brainly.com/question/28331231

#SPJ4

The sum of two nonnegative numbers is 20. Find the numbers if the sum of their squares is as large as possible; as small as possible.
a. The numbers are 10 and 10.
b. The numbers are 0 and 20.
c. The numbers are 1 and 19.
d. The numbers are 20 and 0.

Answers

Option D. The numbers are 20 and 0.

Let the two nonnegative numbers be x and y such that x + y = 20. We know that the sum of the squares of the two nonnegative numbers x and y is as large as possible and as small as possible.

x + y = 20, or y = 20 - x (Since the numbers are non-negative, x, y ≥ 0)

Substituting y = 20 - x into x² + y² = P (for the sake of simplicity), we get x² + (20 - x)² = Px² + 400 - 40x + x² = P

We will take the first derivative with respect to x now: 2x - 40 = 0x = 20

Therefore, one of the nonnegative numbers is 20, and the other is zero. Consequently, the smallest possible sum of squares is 400 (since 20² + 0² = 400).Option D. The numbers are 20 and 0.

To know more about derivative visit:

https://brainly.com/question/23819325

#SPJ11

Given, the sum of two nonnegative numbers is 20.

The problem asks us to find the numbers if the sum of their squares is as large as possible; as small as possible.

Therefore, let's find the sum of their squares at first.If 'x' and 'y' are two numbers, then the sum of their squares is given by:

[tex]x^2 + y^2[/tex]

If the sum of two nonnegative numbers is 20, then one number can be written as x and the other number can be written as y in terms of x.

Thus,y = 20 − xNow, the sum of their squares:

[tex]x^2 + y^2 = x^2 + (20 - x)^2[/tex]
= [tex]x^2 + 400 + x^2 - 40x[/tex]
= [tex]2x^2 - 40x + 400[/tex]
The above expression represents a parabola which opens upward because the coefficient of x^2 is positive.

Therefore, the sum of the squares of the two numbers will be maximum at the vertex of the parabola.

The x-coordinate of the vertex can be found as

:−b/2a = −(−40)/(2.2) = 10Hence, x = 10 and y = 10.

Substituting x = 10 and y = 10, we get

[tex]x^2 + y^2 = 200.[/tex]

Now, to find the smallest value of the sum of their squares, we can observe that the smallest value of x is 0, and the largest value of y is 20.

Thus, if x = 0 and y = 20, we get x^2 + y^2 = 400.

Answer:  The numbers are 10 and 10. The numbers are 0 and 20.

To know more about squares, visit:

https://brainly.com/question/14198272

#SPJ11

Write the Central Limit Theorem for sample means. 3. The average time taken to complete a project in a real estate company is 18 months, with a standard deviation of 3 months. Assuming that the project completion time approximately follows a normal distribution, find the probability that the mean completion time of 4 such projects falls between 16 and 19 months.

Answers

The probability that the mean completion time of 4 projects falls between 16 and 19 months is approximately 0.6568 or 65.68%.

The Central Limit Theorem states that for a sufficiently large sample size, the distribution of sample means will approach a normal distribution regardless of the shape of the population distribution.

Specifically, if we have a random sample of n observations drawn from a population with mean μ and standard deviation σ, then the distribution of the sample means will have a mean equal to the population mean μ and a standard deviation equal to the population standard deviation σ divided by the square root of the sample size n.

In this case, the average time taken to complete a project in the real estate company is 18 months, with a standard deviation of 3 months.

Assuming that the project completion time approximately follows a normal distribution, we can use the Central Limit Theorem to find the probability that the mean completion time of 4 such projects falls between 16 and 19 months.

First, we need to calculate the standard deviation of the sample mean. Since we have 4 projects, the sample size is n = 4.

Therefore, the standard deviation of the sample mean is σ/√n = 3/√4 = 3/2 = 1.5 months.

Next, we can standardize the values of 16 and 19 months using the formula z = (x - μ) / (σ/√n), where x is the value, μ is the population mean, σ is the population standard deviation, and n is the sample size.

For 16 months: z1 = (16 - 18) / (1.5) = -2/1.5 = -1.33

For 19 months: z2 = (19 - 18) / (1.5) = 1/1.5 = 0.67

Using a standard normal distribution table, we can look up the probabilities corresponding to the z-scores -1.33 and 0.67.

The table provides the cumulative probabilities for values up to a certain z-score.

For -1.33, the cumulative probability is approximately 0.0918.

For 0.67, the cumulative probability is approximately 0.7486.

To find the probability between these two z-scores, we subtract the cumulative probability associated with -1.33 from the cumulative probability associated with 0.67:

P(-1.33 < Z < 0.67) = 0.7486 - 0.0918 = 0.6568

Therefore, the probability that the mean completion time of 4 projects falls between 16 and 19 months is approximately 0.6568 or 65.68%.

Learn more about Probability here:

https://brainly.com/question/15052059

#SPJ11

Let {N(t),t > 0} be a renewal process. Derive a renewal-type equation for E[SN (1)+1).

Answers

The renewal-type equation for E[SN(1)+1] is E[SN(1)+1] = 2, indicating that the expected value of the sum of the number of renewals by time 1 plus 1 is equal to 2.

To derive a renewal-type equation for E[SN(1)+1], we can use the renewal-reward theorem.

Let Tn be the interarrival times of the renewal process, where n represents the nth renewal. The random variable N(t) represents the number of renewals that occur by time t.

Using the renewal-reward theorem, we have:

E[SN(1)+1] = E[T1 + T2 + ... + TN(1) + 1]

Since the interarrival times are independent and identically distributed (i.i.d.), we can express this as:

E[SN(1)+1] = E[T] * E[N(1)] + 1

Now, we need to compute the expressions for E[T] and E[N(1)].

E[T] represents the expected interarrival time, which is equal to the reciprocal of the renewal rate. Let λ be the renewal rate, then E[T] = 1/λ.

E[N(1)] represents the expected number of renewals by time 1. This can be calculated using the renewal equation:

E[N(t)] = λ * t

Therefore, E[N(1)] = λ * 1 = λ.

Substituting these expressions back into the renewal-type equation, we have:

E[SN(1)+1] = (1/λ) * λ + 1 = 1 + 1 = 2

Hence, the renewal-type equation for E[SN(1)+1] is E[SN(1)+1] = 2.

To know more about renewal-type equation refer here:

https://brainly.com/question/31971995#

#SPJ11

Poease help! Thank you

Answers

Answer:

28 and 12t

Step-by-step explanation:

4 x 7

4 x 3t

Answer:

28+12t

Step-by-step explanation:

Simplify the expression :)

btw you spelled please wrong

Please can someone help me?

Answers

Answer:

Step-by-step explanation:

Other Questions
How would an object in Earth's atmosphere be deflected as a result of Earth's rotation? How would an object in Earth's atmosphere be deflected as a result of Earth's rotation? to the left in the Northern Hemisphere, and to the left in the Southern Hemisphere to the right in the Northern Hemisphere, and to the left in the Southern Hemisphere to the left in the Northern Hemisphere, and to the right in the Southern Hemisphere to the right in the Northern Hemisphere, and to the right in the Southern Hemisphere Write a differential equation that describes the relationship: Every month the balance B of Rachel's car loan increases by 4.5% and decreases by $375.00. The management of Warmland Manufacturing is trying to decide whether to continue manufacturing a part used in its production; or, to instead buy it form an outside supplier. The part, called WISCO, is a component of the companys finished product.The following information was collected from the accounting records and production data for the year-ending December 31, 2021:1) 7,000 units of WISCO are produced in the Machining Department.2) Variable manufacturing costs applicable to the production of each WISCO unit are:Direct Materials $4.50, Direct Labour $4.30, Indirect Labour $0.50 and Utilities (energy) costs $0.40.3) Fixed manufacturing costs applicable to the production of WISCO are:Cost ItemDirectAllocatedTotalProperty Taxes$ 1,600$ 900$ 2,500Insurance9006001,500Water & Waste500200700Total:$ 3,000$ 1,700$ 4,700All variable manufacturing costs and direct fixed costs will be eliminated if WISCO is purchased from an outside supplier. Allocated costs will have to be absorbed by other production departments.4) The lowest quotation for 7,000 WISCO units from an outside supplier is $70,000.5) If WISCO input units are externally purchased, freight and inspection costs would be $0.30 per unit, and receiving costs of $750 per year would be incurred by the Machining Department.Required ( 15 marks):I. Based on the above information, should Warmland Manufacturing make or buy WISCO? What would be the $ change in Operating Income resulting from a buy decision?II. Would the decision be different if Warmland Manufacturing has the opportunity to produce $4,000 in additional profit with the facilities currently being used to manufacture WISCO?III. Identify two (2) qualitative factors that management may want to consider in its evaluation of the options noted above. Can someone help me please a piece of 14-gauge copper wire (meaning that it has a diameter of 1.63mm) has a resistance of 0.128 . the resistivity of copper is . what must be the length of the wire? If the price of mutton increases from $15/kg to $18/kg, the demand for beef rises from 100 kg to 150kg while the quantity demanded of mutton reduces from 50kg to 30kg.calculate the change in equilibrium P & Q for beefcalculate the change in the equilibrium P & Q for mutton Which of the following BEST summarizes the primary goal of economizing in the decision making process? A. increasing costs while reducing positive consequences B. increasing costs while reducing negative consequences C. decreasing costs while increasing negative consequences D. decreasing costs while increasing positive consequences Please select the best answer from the choices provided A B C D QUESTION TWOGive and explain briefly, the key roles of a project manager ina projectorganisation Decisions makers need information that is useful in making rational decisions, the decisions makers are different and need different information, so every groups of users need different information, but accounting cant adopts the idea of producing a series of special- purpose report, instead that FASB and IAS adopt uniform report which contain information has several characteristics such as understandability, benefits costs, relevance and reliability, explain? Find the Inverse Laplace Transform of each of the following: 1. 42/9s-302. 9s-8/s^2+24s3. 3s-16/s^2-24s-69 Personal and interpersonal influences are strongest in only the early steps of the consumer behavior process.TrueFalse The ABC Company is planning on producing 51500 units of aWidget. The widget uses 0.8 units of raw material. The ABC Companydesires an ending inventory of 13250 units but currently has abeginning ra what is a waves frequency 7. IfQ, and Q2 are orthogonal 1 X matrices, show that the product QO2 is orthogonal. Answer it right for a brainliest what is fun to compare ill give brainliest (worth 15 pts) Explain in what situations it is recommended to use an instrumental variable regression, explain itsbenefits. Name the 3 conditions that must be fulfilled by the instrument in order to obtain unbiasedresults!(5 marks) Read the excerpt from the General Prolgue to the Canterbury Tales. She had been respectable all her life, And five times married, thats to say in church, Not counting other loves shed had in youth, Of whom, just now, there is no need to speak. In this excerpt, the narrator may be unreliable because A. He is grossly exaggerating. B. He is obviously telling lies. C. He is old and experienced. D. He is contradicting himself Hey, so I have to write a Fiction Narrative Writing. Do y'all have any ideas that I can write about?